Cat A to Cat B office fit-out for Riyadh headquarters and floor plates. We deliver partitions, services, cabling and joinery to the landlord's conditions and your move-in date.

Offices That Survive Their Second Reorganisation

Most Riyadh offices are handed over as a Cat A shell: raised floor, exposed grid, a landlord's chilled water connection and very little else. Dar Anan, contracting in Riyadh since 2002, takes that shell to a finished Cat B workspace with partitions, ceilings, cabling, HVAC zoning, joinery and furniture, and hands it back with the landlord's approvals closed out. Our closest recent project is the Roshan Experience Center, a commercial interior where we built a fire-rated steel mezzanine, data and AV, custom furniture and full MEP and HVAC.

Whether an office still works three years later depends on what's above the ceiling and below the floor. We set out underfloor trunking and ceiling containment against your real desk grid, so a department that doubles in size can be re-partitioned without lifting the whole floor again.

200+ Spaces Transformed
20+ Years in Riyadh
Turnkey Design to Handover
Our work in Riyadh

Commercial Fit-Out We've Delivered in Riyadh

Our closest recent work to an office fit-out is Roshan's experience centre, a commercial interior with a structural mezzanine, heavy data and AV, and full MEP.

Roshan Experience Center lounge seen from the steel mezzanine, with timber slat ceiling and booth seating Commercial fit-out

Roshan Experience Center

Client
Roshan
Type
Developer experience centre
Location
Riyadh
Completed
2023

Roshan's experience centre is a commercial interior with the same building blocks as an office fit-out: a structural mezzanine, heavy data and AV, a client lounge, and full MEP and HVAC. We erected a fire-rated steel mezzanine inside the existing shell on new pad footings, then built partitions, floors and ceilings around it.

The lounge below the mezzanine has a timber slat baffle ceiling with linear LED next to an exposed black services ceiling, columns clad in patterned perforated panels, and booth seating. On the showroom side, data and AV hookups feed the LED screen, the lit model table and the display wall.

  • Fire-rated steel mezzanine
  • Data and AV infrastructure
  • Partitions and ceilings
  • Client lounge and seating
  • Custom furniture
  • Full MEP and HVAC
See the project photos →
Industries

Sectors We Serve

The office types we fit out, and what each one needs.

Corporate Headquarters

Head offices with executive floors, boardrooms and reception areas, where joinery, glazing and branding carry most of the budget.

Co-Working Spaces

Shared floors with bookable rooms, phone booths and kitchens, built so the operator can change the layout between tenants.

Tech & Creative Hubs

Open floors with break-out areas and project rooms, where acoustic treatment matters as much as the furniture.

Government & Institutional

Offices with public counters, controlled access and hard-wearing finishes, built to the authority's own standards.

Scope of Works

Office Fit-Out Scope

What we self-deliver on a Cat B office fit-out in Riyadh.

desk

Cat A to Cat B Conversion

Taking a developer-finished shell to an occupied workspace: partitioning, ceilings, floor finishes, power and data to the desk grid, and the landlord's reinstatement conditions recorded from day one.

partition

Glazed & Acoustic Partitions

Single- and double-glazed screens with acoustic ratings set per room type, so a board room, a call booth and an open-plan edge each get the separation they need.

cable

Structured Cabling & Comms

Cat 6A containment, patching and comms-room build with underfloor and ceiling grids set out to the furniture layout, plus dedicated small-power circuits and UPS provision.

hvac

HVAC Zoning for Open Plan

FCU and VAV zoning reworked for the new layout, so cellular offices along the facade and the open-plan core each have their own control.

acoustic

Meeting Rooms & AV

Acoustic ceilings, wall absorption and floor isolation in meeting and board rooms, with AV backboxes, screen supports and cable routes built in before the ceiling closes.

shield

Life Safety Adaptation

Fire alarm, detection, emergency lighting and sprinkler heads relocated and re-certified for the new partition layout. This is what most often holds up an occupancy sign-off.

Our Expertise

Why Tenants Use Dar Anan for Riyadh Office Fit-Outs

We deliver the MEP, partitions and joinery with our own teams, so the services and the finishes are planned together and the floor can change later without starting again.

Open plan and private rooms on one floor

Open-plan desks next to meeting rooms with the acoustic separation each room needs.

Cabling set out to the desk grid

Underfloor and ceiling containment laid out to your furniture plan, with spare capacity for the next reorganisation.

Executive floors

C-suite offices and boardrooms with timber panelling and acoustic privacy.

Dar Anan fit-out team installing ceilings and joinery on a commercial interior in Riyadh
Our Clients

Trusted by Industry Leaders

Our Approach

Office Fit-Out Programme

Indicative stages for a single-floor Cat B office fit-out in Riyadh. Actual duration depends on floor area, landlord approval turnaround and long-lead joinery.

01

Survey, Test Fit & Landlord Pack

Measured survey against the demise, a test fit of the headcount onto the floor plate, and the landlord submission pack. We record the Cat A condition and reinstatement obligations at this stage.

02

Approvals & Long-Lead Orders

Landlord and building-management approval runs alongside ordering the glazed partitions, joinery and any specified furniture. These are usually the critical path on an office.

03

Strip-Out & First Fix

Cat A finishes lifted where required, then containment, small power, data, HVAC branches and sprinkler modifications installed and inspected while the ceiling is still open.

04

Partitions, Ceilings & Joinery

Partition build and glazing installation, ceiling close-up, floor finishes and reception and tea-point joinery, with services accessible for testing throughout.

05

Commissioning, Furniture & Handover

Balancing and commissioning, fire alarm re-certification, furniture install, joint snagging, then as-builts and O&M manuals before you move in.

Service Areas

Where We Fit Out Offices in Riyadh

We work across Riyadh's commercial districts and know how each building's management runs approvals, service lifts and out-of-hours noisy work.

  • 📍 KAFD
  • 📍 Al Olaya
  • 📍 King Fahd Road
  • 📍 Digital City
  • 📍 Granada Business Park
  • 📍 Al Muruj
Working in Riyadh

What an Office Fit-Out in Riyadh Actually Involves

Riyadh's office market has grown faster than its supply of experienced tenant fit-out contractors. These local conditions decide whether a Cat B programme holds, and they differ from Dubai or London.

01

Civil Defence certification decides your move-in date

Every change to the partition layout changes sprinkler coverage, smoke detection zoning and emergency lighting. Those changes need Saudi Civil Defence review and a certificate, and you can't occupy the floor without it. The inspection falls at the end of the programme, when there's no contingency left, so we submit early and book the inspection into the programme.

02

SBC 601 applies to the fit-out specification as well as the base build

The energy conservation provisions of the Saudi Building Code cover lighting power density, glazing and insulation in the fitted interior. A specification approved on looks alone can fail here, and the correction comes after the ceiling is closed.

03

KAFD, Digital City and Olaya each run building management differently

In the towers, the work itself is rarely what holds a programme back. Service-lift booking, permitted noisy-work hours, waste routes and the landlord's approval cycle do. Access conditions alone can put two weeks between a floor plate in KAFD and one on King Fahd Road, so we confirm them before pricing.

04

HVAC has to be sized for a Riyadh summer

Base-build chilled water capacity is usually enough for the developer's assumed density and often too little for yours. Summer design conditions reach the mid-forties, so an open plan with more people than the Cat A assumption will struggle from its first July unless the zoning is reworked.

05

Record the Cat A condition at handover, in writing

Riyadh leases routinely require reinstatement to Cat A at exit. Almost nobody documents the condition they received, so the dilapidations assessment happens years later against a standard nobody can prove. We photograph and schedule the as-received condition at mobilisation on every job.

06

Saudization affects labour planning on long programmes

Nitaqat quotas and the availability of specific skilled trades shape how a fit-out is resourced. We plan for them from the start, and it's one reason we deliver MEP ourselves instead of assuming a subcontractor can mobilise on demand.

If you're comparing office fit-out tenders in Riyadh, ask each contractor when the Civil Defence submission goes in, what the landlord's noisy-work hours are, and whether the base-build cooling has been checked against your headcount. A tender that doesn't answer those hasn't really been priced.

Common Questions

Office Fit-Out in Riyadh: Common Questions

What tenants and their project managers ask us before an office fit-out in Riyadh.

What is the difference between Cat A and Cat B office fit-out?

Cat A is what the developer hands over: raised floor, suspended ceiling grid, basic lighting, fire detection and a chilled water or air connection. It's finished but you can't work in it. Cat B turns it into your office: partitions, meeting rooms, floor finishes, joinery, power and data to the desk grid, HVAC zoning for your actual layout, and branding. Most Riyadh office leases hand over at Cat A. Record the exact Cat A condition at the start, because your lease will require you to reinstate to it at exit.

How much does an office fit-out cost per square metre in Riyadh?

Four things drive cost far more than area. The first is partition density, meaning how many cellular offices and meeting rooms you have per hundred square metres. Then come the specification of joinery, glazing systems and finishes, how much of the base-build HVAC, electrical and sprinkler installation has to be reworked for your layout, and whether the building requires out-of-hours working. A lightly partitioned open plan and an executive floor with full-height double glazing and bespoke panelling can differ several-fold in cost, so we price from a test fit instead of a rate card.

How long does an office fit-out take in Riyadh?

Construction is rarely the constraint. On most offices the critical path runs through the landlord's approval turnaround and the lead time on glazed partition systems and joinery, both of which are ordered before site work begins. The usual sequence is survey and test fit, landlord submission, long-lead procurement, strip-out and first fix, partitions and finishes, then commissioning and furniture. We set the programme backwards from your lease commencement or move-in date and tell you in week one which items decide it.

Do you handle the landlord approval process?

Yes. We prepare the tenant fit-out submission, take it through the landlord and building management review, and close out their comments before mobilising. We also record the Cat A handover condition in writing at the start of the job. That record protects you at lease exit, when the landlord's dilapidations claim is assessed against a condition nobody documented five years earlier.

Can you fit out an office while we keep working in it?

Yes. Phased fit-outs are common where a lease has no overlap period. We split the floor into zones behind sealed containment hoarding, run noisy work such as coring, demolition and fixing in evening or weekend windows agreed with building management, and keep fire escape routes and detection working in the occupied half at all times. It costs more per square metre and takes longer overall, so compare it against short-term swing space before committing.

Who reinstates the fire alarm and sprinklers when partitions change?

We do, as part of the contract. A new partition layout changes sprinkler head coverage, smoke detection zoning and emergency lighting. Those systems have to be modified and re-certified, and the certificate is normally a condition of the building's occupancy sign-off. It's one of the most common causes of a late move-in, so we programme and price it from the start instead of treating it as a variation.

Further Reading

Fit-Out Guides

Background reading on office fit-out programmes, contract types and contractor selection in Saudi Arabia.

More From Dar Anan

Other Fit-Out Services in Riyadh

Planning an Office Fit-Out in Riyadh?

Send us the floor plate and your headcount, and we'll come back with a test fit, a scope and a programme.