Serviced Apartment Fit-Out

Serviced Apartment Fit-Out in Riyadh

Hotel apartment interiors from studio to three-bedroom units, with the lobby, amenities and MEP behind them, built from an approved mock-up and repeated across every unit.

Serviced Apartment Fit-Out Contractor in Riyadh

Dar Anan fits out serviced apartment and hotel apartment buildings in Riyadh, from shell-and-core new builds to full refits of existing stock. We deliver the units, the shared areas and the MEP behind them under one programme, with one point of accountability to the owner and the operator.

A serviced apartment sits between a hotel and a home. Guests stay longer, cook, do their own laundry and use the space hard, and housekeeping still has to turn the unit round between stays. That changes the brief: more storage, a working kitchenette, finishes chosen for wear rather than for opening day, and a unit design that can be repeated many times without drift. It is the same repeat-build discipline as our wider hospitality fit-out work, applied to apartments.

2002 Building in Riyadh Since
In-House MEP, Electrical & Plumbing
12-Month Defects Liability Period

One Approved Unit, Then the Rollout

The most important room in a serviced apartment project is the mock-up unit. We build one complete apartment of each main type to final specification, and the owner, operator and designer review it before anything is ordered in bulk. Joinery fixings, kitchenette clearances, bathroom waterproofing, lighting positions and access panels are settled there, and every unit that follows is built and snagged against that approved sample. Our guide to hotel guestroom mock-ups explains how the sign-off works.

Typical scope on a serviced apartment building includes:

  • Studio, one-, two- and three-bedroom units with living, dining and sleeping areas
  • Kitchenettes and full kitchens with cabinetry, worktops, appliances and extraction
  • Bathrooms and en-suites with full waterproofing, sanitaryware and shower enclosures
  • Built-in wardrobes, storage, desks and TV walls in durable, repairable finishes
  • Lobby, reception, lounge and corridors finished to the operator's standard
  • Gym, guest laundry, prayer rooms, housekeeping stores and staff areas

New Building, Conversion or Refit

New buildings. We start from shell and core, coordinate the MEP first fix with the unit layouts, and roll the fit-out floor by floor once the mock-up is approved. If the building is not yet built, our hotel construction team can deliver the structure and the fit-out together.

Conversions. Residential or office buildings converted to hotel apartments, where the existing services and layouts have to be checked against the operator's standard and the classification requirements before design is frozen.

Refits of operating buildings. Batches of units taken out of inventory in agreed phases, with the rest of the building trading. For lobbies and shared spaces, see our guide to hotel lobby and public area fit-out.

What We Deliver

Serviced Apartment Fit-Out Scope

Studio to Three-Bed Units

Partitions, ceilings, flooring, lighting and finishes for every unit type, built to the approved mock-up and checked against it before handover.

Kitchenettes & Kitchens

Cabinetry, worktops, integrated appliances, extraction and the power and water connections behind them, specified for daily use by long-stay guests.

Bathrooms & Waterproofing

Tanking, falls to drains, tiling, sanitaryware and shower enclosures, with the waterproofing detail fixed at mock-up and repeated identically in every unit.

Joinery & Durable Finishes

Wardrobes, storage, desks and TV walls in hard-wearing, repairable materials, with corner protection and finishes housekeeping can clean quickly.

Lobby, Reception & Amenities

Arrival areas, reception desks, lounges, corridors, gyms and guest laundries, finished to the operator's standard and built for heavy daily use.

MEP, HVAC & Controls

Electrical, plumbing and HVAC second fix in every unit, room controls and key-card integration, and the fire and life-safety interfaces, delivered in-house.

Why Dar Anan

Why Owners Choose Dar Anan for Serviced Apartment Fit-Out

On a repeat-unit project, small inconsistencies multiply. We keep the MEP in-house, fix every detail in the mock-up, and run the units, shared areas and services under one programme, so the hundredth unit matches the first.

Built to the Approved Mock-Up

Every unit is snagged against the signed-off sample, not against a reading of the drawings.

Finishes Chosen for Turnover

Materials are selected for cleaning, wear and quick repair, so units stay in inventory rather than in maintenance.

One Team for Interiors and MEP

Kitchenette power, bathroom plumbing and unit HVAC coordinated by the same team that builds the finishes.

Serviced apartment and hotel apartment building fit-out in Riyadh
Our Clients

Trusted by Industry Leaders

How We Work

Our Serviced Apartment Fit-Out Process

From the standards review to the last unit handed over, with the mock-up gating the rollout.

01

Survey & Standards Review

We survey the building, record existing services, and review the layouts against the operator's standard and the target classification category.

02

Mock-Up Unit & Sign-Off

One complete unit of each main type is built to final specification and reviewed by the owner, operator and designer. Details are fixed here.

03

Procurement

Sanitaryware, appliances, joinery, ironmongery and lighting are ordered in bulk against the approved mock-up, with delivery phased to the rollout.

04

Floor-by-Floor Rollout

Units built in a rolling sequence of first fix, finishes, joinery and second fix, with shared areas and amenities programmed alongside.

05

Snagging & Handover

Each unit is snagged against the mock-up, systems are tested and commissioned, and the building is handed to the operator's pre-opening team with a 12-month defects liability period.

Our Work

Hospitality Projects

Hospitality interiors delivered by Dar Anan in Riyadh.

Service Areas

Serviced Apartment Fit-Out Across Riyadh

We fit out serviced apartment and hotel apartment buildings across Riyadh's business and residential districts, including:

  • 📍 Al Olaya
  • 📍 Al Malqa
  • 📍 King Fahd Road
  • 📍 KAFD
  • 📍 Al Sulimaniyah
  • 📍 Al Yasmin
Working in Riyadh

What Serviced Apartment Fit-Out in Riyadh Involves

A unit that works for a two-night hotel stay does not always work for a two-month one. These are the local conditions that shape the brief.

01

Ministry of Tourism classification sits beside the brand standard

Hotel apartments are licensed and classified by the Ministry of Tourism. Its category requirements for units and facilities apply in addition to the operator's manual, so both are checked against the layout before the mock-up is built.

02

Kitchenettes need power and extraction planned early

Hobs, ovens, washer-dryers and dishwashers in every unit add up to a significant electrical load. Circuit capacity, extraction routes and SEC supply arrangements are confirmed at design stage, not when the first appliances arrive.

03

Long stays mean the units are lived in

Riyadh serviced apartments host business travellers, project teams and families staying for weeks or months. Storage, wardrobe space, a usable kitchenette and a quiet bedroom matter more here than in a hotel room used for two nights.

04

Summer HVAC has to work in every unit

Fan-coil sizing, condensate drainage and the sealing of each unit's envelope have to cope with mid-forties temperatures and a facade under solar load. A marginal unit on the west elevation becomes a repeated complaint every July.

05

Hard water and dust wear finishes quickly

Riyadh's water hardness damages mixers, kettles and washing machines, and dust loads filters and open shelving. Water treatment, filtration and closed storage are specified at the start rather than after the first year of complaints.

06

Imported fittings set the rollout pace

Sanitaryware, ironmongery, appliances and some joinery components are imported. The rollout is planned around their arrival after customs clearance, ordered against the approved mock-up so the quantities and specification are right first time.

Send us the unit mix, the drawings and the operator's standard, and we will come back with a mock-up and rollout programme and a proposal.

Further Reading

Serviced Apartment and Hotel Fit-Out Guides

Mock-ups, public areas, FF&E and budgets for hospitality interiors in Riyadh.

Common Questions

Serviced Apartment Fit-Out in Riyadh: Common Questions

What owners and operators ask us before appointing a serviced apartment fit-out contractor.

What does a serviced apartment fit-out include?

The complete interior of every unit and the shared areas around them: partitions and ceilings, flooring, fixed joinery and wardrobes, kitchenettes, bathrooms, lighting, and the electrical, plumbing and HVAC second fix behind them. Outside the units it covers the lobby and reception, corridors, the gym, guest laundry, any meeting or lounge space, and back-of-house areas such as housekeeping stores and staff rooms. Loose furniture and operating supplies can be included or left to the operator, as agreed at tender.

Why do you build a mock-up unit first?

Because every decision made in one unit is repeated in every other unit. The mock-up is a complete apartment built to final specification and reviewed by the owner, the operator and the designer. Joinery fixings, kitchenette appliance clearances, bathroom waterproofing, socket positions and access panels are all fixed there, so the rollout is built to an approved sample rather than to an interpretation of the drawings.

Can you work to an operator's brand standards?

Yes. Where a serviced apartment brand is appointed, its design and technical standards set unit layouts, kitchenette equipment, bathroom details, acoustic performance and finishes. We build to that manual, and where it conflicts with the building or with Saudi requirements we raise it as a technical query at mock-up stage.

Does a hotel apartment need classification in Saudi Arabia?

Hotel apartments are a licensed category of tourism accommodation, and classification is administered by the Ministry of Tourism. The classification sets requirements for unit sizes, facilities and services that apply alongside any operator standard. The criteria change, so the owner or operator should confirm the current requirements for the target category before the layout is frozen, and we build to them.

How do you choose finishes for high guest turnover?

Durability comes first. Porcelain rather than soft stone on high-wear floors, solid-surface or quartz worktops, scrubbable wall finishes, protected corners in corridors, hard-wearing ironmongery and sanitaryware with spares available locally. The aim is a unit housekeeping can turn round quickly and maintenance can repair without closing it for a week.

Can you refit a serviced apartment building while it stays open?

Yes, floor by floor or block by block. Units come out of inventory in batches agreed with the operator, work areas are sealed, materials move through a dedicated route, noisy work is kept to agreed hours, and fire detection and escape routes stay live in the occupied parts of the building throughout.

Do you handle the MEP as well as the interiors?

Yes. Our MEP, electrical and plumbing teams are in-house, so kitchenette power and extraction, bathroom water supply and drainage, unit HVAC and controls, and fire and life-safety interfaces are coordinated by the same team that builds the finishes.

What warranty do you give?

Each unit is snagged against the approved mock-up and drawings before handover, all systems are tested and commissioned, and the project carries a 12-month defects liability period.

More From Dar Anan

Other Fit-Out Services in Riyadh

Planning a Serviced Apartment Fit-Out in Riyadh?

Tell us about the building and the unit mix. We'll survey it, scope the works and send a detailed proposal — no obligation.